Reports
# | Report | Date | Download Link |
---|---|---|---|
1 | Project Proposal | 12.10.2020 | link |
2 | Project Specifications | 26.10.2020 | link |
3 | Project Analysis Report | 23.11.2020 | link |
4 | High-Level Design Report | 10.01.2021 | link |
5 | Low-Level Design Report | 14.03.2021 | link |
6 | Updated Low-Level Design Report | 29.03.2021 | link |
7 | Test Plan Report | 03.05.2021 | link |
8 | Final Report | 10.06.2021 | link |
9 | Recent deliverables | 10.06.2021 | link |